FM 110 Proposed 16” Waterline
Project Type:
Utility
Project Status:
In Planning/Study
Location:
Yarrington Road
Kyle,
TX
78640
See map: Google Maps
This project includes the installation of approximately 5,000’ of 16” PVC waterline from the Yarrington Pump Station, along the new FM 110, and ultimately connecting to the future Waterstone Subdivision. The project is currently in 100% design and will go into construction later this year.