Waterleaf Subdivision Wastewater Line Upsize/Relocation
This project includes the installation of approximately 5,000’ of 24” wastewater line from the Cool Springs Phase 1 Subdivision, through the drainage channel in the Waterleaf Subdivision, and tying into the influent pipeline at the WWTP. The project is currently in 60% design.